Laserfiche WebLink
4- <br />12. Primary' future (Post-mining) land use (check one): <br />Cropland(CR) <br />_ Rangeland(RL) <br />` Pastureland(PL) <br />General Agriculture(GA) <br />x Wildlife Habitat(WL) <br />Forestry(FR) <br />_ Residential(RS) Recreation(RC) <br />_ Developed Water Resources(WR) <br />t3. Primary aresent land use (check one): <br />_ Cropland(CR) x Pas[ureland(PL) <br />Itangeland(RL) Forestry(FR) <br />_ Residentiai(RS) _ Recreation(RC) <br />Developed Water Resources(WR) <br />IndustriaL'Commercial(tC) <br />Solid Waste llisposal(WD) <br />General Agricvltvre(GA} <br />WildlifeHabitat(WL) <br />_ IndusnialiConvnercia](IC} <br />14. Method of Mining: Briefly explain mining method (e.g. truckishovel): Track hoe will remove gravel from below water line <br />and place on bank to drv. Front-end loaders will load the mobile crusherlscreener plant. <br />15. On Site Processine: X Crushing/Scrcening <br />t3.1 Briefly explain mining method (e.g. truck/shovel): Track hoe will remove gravel from below water line <br />and place on bank to dry. Front-end loaders will load the mobile crusher/screener plant. <br />List any designated chemicals or acid-producing materials [o be used or stored within permit azea: <br />16. Descriotion of Amendment or Conversion: <br />If you are amending or convening an existing operation, provide a brief narrative describing the proposed change(s). <br />Mining to this point has taken place above the water table. The next next 30 feet down of gravel <br />will be mined via track hoe. Lakes and wetlands are the new post-mining land uses in the disturbed area. <br />