My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-11_REVISION - M1994005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994005
>
2006-12-11_REVISION - M1994005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:06 PM
Creation date
11/21/2007 10:02:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994005
IBM Index Class Name
Revision
Doc Date
12/11/2006
Doc Name
Amend Appl
From
Oldcastle SW Group, Inc. dba United Companies of Mesa County
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN <br />1. General Reclamation Plan <br />EXHIBIT E <br />The total disturbed azea to be reclaimed under this permit is 63.1 acres. The post-mining land use <br />for the entire permit azea will be wildlife habitat and recreation. Wetlands will be planted along <br />the perimeter of the lake, and dry rangeland will exist on the flat azeas above the lake, and on the <br />slopes of the lake. Road access will be maintained to the lakes as shown on Map F. Map F also <br />shows the post-mining topography and identifies the wetland and dry rangeland azeas. <br />Table E-1 shows the distribution of reclaimed azeas. <br />Table E-1 <br />Reclaimed Use Area <br />Water Surface 43.7 <br />Wetlands 2.12 <br />D land Areas 14.85 <br />Road Access 2.43 <br />Total 63.1 <br />RECEI~iFD <br />DEC 1 12006 <br />Division of Reclamation, <br />Mining and Safety <br />As described in the mining plan, reclamation will occur concurrently with mining. Since the <br />phases for the remaining mining will be mined to the final slope, no backfilling will be needed. <br />Topsoil will be replaced on all graded azeas except those azeas that aze 5 feet or more below <br />expected water level. Topsoil is available from the stockpiles shown on Map C-1 and C-2. By <br />concurrently mining and reclaiming the Phases, the acreage which is unreclaimed will be <br />minimized, which will make the worst case reclamation smaller and thus, the bond will be <br />smaller. All slopes will be 2H:1 V with the exception of the first 6 feet below the water level, <br />which will be 3H:1 V slope. <br />The worst case reclamation scenario occurs at the current site conditions at the end of 2006. At <br />this point the unreclaimed azea will be the lazgest and topsoil will need to be replaced on the <br />entire pit bottom. The maximum pit bottom area will be exposed, along with several sections of <br />pit slopes. Several structures would require to be removed such as the office building, asphalt <br />Colona Pit November 06 E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.