My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-11_REVISION - M1994005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994005
>
2006-12-11_REVISION - M1994005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:06 PM
Creation date
11/21/2007 10:02:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994005
IBM Index Class Name
Revision
Doc Date
12/11/2006
Doc Name
Amend Appl
From
Oldcastle SW Group, Inc. dba United Companies of Mesa County
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition h> this complehYl reclamation, the following table lists all stockpiles on site at the end <br />of 20116. witi~h arc shown on ~1ap C-1. <br />Berm and Stockpile'1'able <br />erm DescripUOn Avg eight ength lope olume Locatwn <br />Ovorburden 10' 805 2 .1V 5, 2 West side, north of Coloy <br />opsor 1 1 est lido an o south side <br />opsor 15' 14 1 33 L o south and soulhwost corner <br />opsoJ 3 7 1 1 8. ' 4 ast side <br />opsod toe pie In d at northern end <br />Offal 1 ,152 <br />As Phases 2 through > arc mined, Utc bemts and stockpiles will be used to reclaim the final pit <br />slopes. 1'he overbunlen will be ultimately placed at the bcittom of the United Lake after <br />extraction bclo+v the ++•ater table has token place. The tops<~il will be us~t to reclaim the <br />remaining slopes (primarily on the cast side of the pill anJ the minor upper terrace areas around <br />the perimeter. The total topsoil stockpiled is 14.190 cy. This is more than adcyuate to reclaim <br />the site. Worse case mclamatiun is actually at the end of 2(106, betitre any muting below the <br />water table occurs, since this is the must arcs that rcyuires topsoiling. Also, Ate stockpiles arc the <br />largest at this time. <br />Sines the site has lien in production since 1994 and the surface dislurhance is not changing. <br />there is nu new topsoil ur u+erburdcn which will be stripped in this 2006 Amendmertt. <br />Mining activities arc expcctcxl to occur year round, while the processing opcratiims, including <br />screening,'erushing and +vashing, which will occur approximately 3-S months per year, although <br />the time tier these activities will nut necessarily he umeurrcnt and crvshing~scrcening activities <br />may take place several tinxs throughout the year tier the cumbinal total. <br />The in-pit minx road sho+vn in Map C'-4 will be used only to allow access to Phases 4 ~ 5. Upon <br />completion of the mining in those Phases. the road will be mined out. Tits configuration after <br />mining out the road is seen on ~1ap F. <br />C'ulurru Pir :~'orent/x•r 06 D-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.