Laserfiche WebLink
<br /> <br />was pumped and treated during the month of January 2000 (10,893,300 gallons). <br />Therefore, [he remaining volume necessary to be pumped and treated is 682,226.700 <br />gal Ions. <br />WATER MANAGEMENT TREATMENT AND ESTIMATED COSTS <br />Volume required to be treated equals 682,226,700 gallons <br />Cost per thousand (1,000) gallons treated equals $6.90 per 1,000 gallons. <br />Estimated Cost to treat the remaining volume equals: <br />(Total Volume)/1,000 gallons ($6.90) = 682,226,700/1,000 gallons ($6.90) <br />682,227 treated units ($6.90) _ $ 4,707,336 <br />Monitor 8 wells at 1 sample/month at $100.00fsample = $9,600(year (7.25 years) <br />_ $69.600 <br />CDPS discharge monitoring <br />12 months u 4 samples/month at $200.00/sample = $9,600 (7.25 years) _ $69,600 <br />Total - $4,707,336 + $ 69,600 + $ 69,600 = $ 4,846,536 <br />Contractor's Overhead and Profit - 13.1 percent = $ 634,896 <br />Total = $ 5,481,432 <br />Minerals Program Fee - ~ percent = $ 242,327 <br />Total Estimated Obligation $ 5,723,759 <br />Total Remaining Obligation = $ 2,1 14,035 <br />Total Estimated Performance Bond Requirement = $ 7,837.794 <br />Existing Financial VJan'anty Amoun[ _ $ 6,100,000 <br />Additional Financial Warranty Required = $ 1,737,794 <br />