My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-21_REVISION - M1977170
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977170
>
2004-12-21_REVISION - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:09:17 PM
Creation date
11/21/2007 9:52:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
12/21/2004
Doc Name
TR Approval
From
DMG
To
Butala Construction Company
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Agency or organization name :OMG <br />Permit or other job action : TR-02 <br />Task descdption :Reduce <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 18.000 <br />to 2h:1 v <br />Basic machine :Cat D8R Series II - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br /> Utilization <br />Ownership costlhour : $49.88 NA <br />Operating cost/hour : $66.09 100 <br />Ripper op. cosfRiour : $2.32 25 <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $150.04 Total fleet cosNhour <br />Shift basis : 1 per day <br />Data source : (CRG) <br />09 <br />Swell Loose <br />CCY factor : 1.165 volume : 20,970 LCY <br />Source of estimated volume :AM-01 Applicati <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted howdy production : 491.9 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 7,190 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock. 50% Earth <br /> <br /> <br />~ <br />~ <br />~~~ ~~ ~ <br />iition <br />Correction <br />Factors <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Matedal weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.36 <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 310 <br />Source <br />HB) <br />174.79 LCY/hr <br />349.58 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 59.99 Hours <br />Unit cost : $0.858 /LCY Total job cost : $18,001 <br />Task # : 001 State :Colorado PermitCob# : M-1977-170 <br />Date : 12/20/2004 County :Chaffee Abbreviation :none <br />User: ESC Site :Butala Gravel Pit Filename :M170-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.