Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User: <br />Agency or organization name :DMG <br />006 State :Colorado <br />1221/2004 County :Chaffee <br />ESC Site : Butala Gravel Pit <br />Permit or otherJob action :Tr-02 <br />Task description :Replace Growth Medium in Wash Pond Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 627G <br />-Push dozer :Cat D8R Series 11 - 8SU <br />Support equipment -Load area : NA <br />-Dump area :Cat D8R Series 11 - 8SU <br />Road maintenance -Motor grader :INA <br />-Water Wck :NA <br />Cost Bre <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 dozer NA dozer NA NA <br />Utilization-machine : 99 100 NA 100 NA NA <br />-Ripper attachment : NA 20 NA 0 NA NA <br />Ownerhipcostlhour: $44.83 $48.82 NA $48.82 NA NA <br />Operatingcost/hour: $112.48 $66.09 NA $66.09 NA NA <br />Ripper op.cosUhour: NA $1.42 NA $0.00 NA NA <br />Operator cosUhour : $32.13 $31.76 NA $31.76 NA NA <br />Unit subtotals : $189.44 $148.09 NA $146.67 NA NA <br />Number of units : 2 1 0 1 0 0 <br />Group subtotals : Work : $526.97 Support : $146.67 Maintenance : $0.00 <br />Total work team cosUhour : $673.64 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,302 CCY factor : 1.125 volume : 4,840 LCY <br />Source of quantity take-off :DMG 1998 Estimate <br />Source of estimated swell factor :CAT Handbook <br />PermiVjob # : M-1977-170 <br />Abbreviation :none <br />Filename :M170-006 <br />>~ ~ <br />,sue.,..... __ .,; ~ ~.., .<.~..~ ~ ,.-..... <. <br />