Laserfiche WebLink
RECLAMATION COST BREAKDOWN <br />Phase 1 (34.1 acres) <br />Slope, grade and replace 18" of overburden and topsoil <br />82,522 cy @ $.65/yd $53,639.30 <br />Seed ($2/Ib., 14.25 lb./acre) 971.85 <br />Apply seed & mulch ($275/acre) 9,377.50 <br />Fertilizer 2.55 tons @ $250/ton 637.50 <br />Total $64,626.15 <br />Phase 2 (21.13 acres) <br />Slope, grade and replace 18" of overburden and topsoil <br />51,135 cy @ $.65/yd $33,237.49 <br />Seed ($2/lb, 14.25 lb./acre) 602.21 <br />Apply seed & mulch ($275/acre) 5,810.75 <br />Fertilizer 1.58 tons @ $250/ton 395.00 <br />Total $40,045.45 <br />Phase 3 (15.5 acres) <br />Slope, grade and replace 18" of overburden and topsoil <br />37,510 cy @ $.65/yd $24,381.50 <br />Seed ($2/lb., 14.25 lb./acre) 441.75 <br />Apply seed & mulch ($275/acre) 4,262.50 <br />Fertilizer 1.16 tons @ $250/ton 290.00 <br />Total $29,375.75 <br />P~ ~a <br />