EXHIBIT D <br />MINING PLAN <br />A) The mining plan will cover 70.9 acres which will include the current 9.42 <br />acres that are presently being mined under a 110 Permit, #79-103. An additional <br />23.2 acres will be a buffer zone and will not be disturbed as shown on the map. <br />The mining activity will continue on the same gravel formation elevation at <br />6585'. A 3 Phase Plan will include taking out the west gravel berm, that is <br />currently a berm left on the west boundaries going south to the north. This will be <br />replaced by a 10-15' overburden berm to provide a wind, sound and site barrier <br />for the mine. An agriculture right of way (road) will be left in the berm for non- <br />mining access. Phase 1 will include 34.1 acres of area to be disturbed. During <br />this time, the active mining will move east for 2500'. As movement proceeds at <br />an expected rate of 250' east by 720' north and south per year, the north highwall <br />will be graded to a 2:1 slope. Topsoil will be bermed 10' - 15' high all along the <br />north permit boundary for sight, sound and wind protection. The topsoil on the <br />north side will be bermed 1080' to a north/south property line and stop. After that <br />point, topsoil generated by stripping operations will be stockpiled in the active <br />mining area on the pit floor as part of our reclamation plan. Proper signage will <br />identify these topsoil piles. The gravel on the south boundary will be daylighted <br />out and overburden berms will be placed for pit protection all along from pit <br />access road easterly. <br />The stockpile areas on the north and south side and mining area will be stripped <br />of approximately 6" of topsoil. The overburden (1'- 4') will be stockpiled on the <br />south side of Phase 1 during mining. It is estimated that 700,000 tons of gravel <br />reserved are available to be mined during this Phase. <br />As the mining proceeds and reaches the 1800' to the east, all overburden and <br />topsoil will be brought down to the west pit floor starting at the west boundary <br />moving towards the east. A 400' x 400' area will not be reclaimed as it will be <br />the area designated for a material washing area along with pit access roads, <br />stockpiles and roads leading to them, along with an agriculture access road that is <br />currently there. The southwest comer extending 400' north x 400' east will be <br />reserved for washing operations in the future if needed. Water will be obtained <br />from rights from the owners and will be recycled in ponds adjoining the wash <br />plant with no water leaving property, no discharges will be allowed. <br />The Phase 2 mine plan will move diagonally from the west/north corner which <br />lies 1080' east of the west boundary line following the gravel seam to northeast. <br />This phase contains 21.3 acres. It is estimated that 625,000 tons of gravel <br />reserves lie in this phase. The 6"- 12" of topsoil and 2' of overburden will be <br />stripped off the top of the gravel and placed in separate piles on the east pit <br />boundaries. As mining moves northeasterly, the west slope will be sloped to 2: ] <br />while mining with 3:1 slopes at the time of reclamation. <br />~~ 19 <br />