f. there is a pit excavation in the middle of the existing pit. Dimension is appr. 450' <br />by 120' <br />g. same <br />h. same <br />there will be no significant effect on the hydrology and water quality in the azea. <br />There is no evidence of ground water that will be affected by the operation. The <br />site generates minimal runoff, evidenced by the annual precipitation as stated in a <br />letter from the Natural Resources Conservation Service. If necessary, diversion <br />ditches, berms and/or sediment basins will be constructed to control surface <br />runoff; <br />j. no injury to existing water rights is expected; <br />k. if refuse and acid or toxic producing materials are exposed, excavation operations <br />will immediately cease. Exposed azeas will, without delay, be buried and covered <br />with other excavated material and compacted; <br />after reclamation, slopes will not be steeper than 3:1 the NRCS's recommendation <br />for revegetaion will be followed. The bottom of the pit should be relatively level; <br />m. the deposit will be processed on site. A dozer, loader and/or trucks will be used to <br />push, load and haul topsoil to the topsoil stockpile. After the topsoil is relocated, <br />the dozer and loader will commence to excavate material (pit run). The loader will <br />dump the pit run into the hopper which feeds the crusher-screen, dumping onto <br />the flat belt(s) that dumps onto the stacking conveyor that dumps the processed <br />material on to the processed material stockpile. The initial extraction will start in <br />the middle and progress towazd the northern and southern azeaa of the pit. After <br />some duration, the operation will be relocated to another pit. During these periods <br />of idleness, this pit needs to stay active. When processing-excavation continues, <br />the progression will again be towazd the north and south; <br />n. gravel/sand is the primary commodity and used for road <br />construction/maintenance. No secondazy commodity is expected; <br />o. no incidental products aze expected; <br />p. no explosives will be used in mining or reclaiming; <br />EXHIBIT D -Reclamation Plan <br />1. a. minimal depth of overburden is expected and will be used in the production of <br />the gravel base. <br />