My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-02-22_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2005-02-22_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:13 PM
Creation date
11/21/2007 9:48:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
2/22/2005
Doc Name
Mayflower Acid Dosing Station Certification
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIM/~( MOLYBDENUM COMPANY Climax Mine <br />® A Subsidiary of PM1elps OoCBe Mln~nO CnmpanY I"IWy. 91 <br />Climax. Colorado 80429 <br />[71 91 466-21 50 <br />RECE~1/f=® Fax (7191486-2251 <br />FE611 1005 ~ <br />February 15, 2005 <br />/ Division rrf Minerals and Geology <br />Mr. Allen Sorenson v <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 / / ~~ ' ~~ <br />13E: Mayflower Acid Dosing Station Certification/, MLRB Permit No. M-77-4913/ <br />Dear-Mr. Sorenson: <br />Climax submitted construction drawings for facility upgrades to the Division of Minerals and Geology <br />(Division) in a letter dated July 26, 2004. DMG inspected the temporary acid dosing facilities to be used <br />during the constmction of the upgraded acid delivery system in October, 2004. This letter certifies the <br />completion of the upgrade to this Environmental Protection Facility (EPF) in accordance with Rule <br />7.3.2(2). <br />Construction of these upgrades has followed [he original plans with two minor changes as noted below: <br />1. Four 5 to 50 psi backpressure valves have been added to the circuit immediately off the discharge <br />of the acid feed pumps. In order to install these valves, the initial piping off of the pump dischazge <br />points, is threaded stainless steel. This will allow for fine tuning of the acid feed system and <br />prevent spikes in acid feed through the pumps. <br />2. The discharge line from TK-02 was routed to the pump clear well and back into the treatment <br />system via the 5-Dam seep pump-back under the building instead of to the pond. This will <br />eliminate the possibility of shearing the PVC line due to ice shift in the clearpond. <br />Imegrity testing of the existing tank was performed as part of the project. Copies of [he integrity tests are <br />included. A set of as-built drawings will be submitted to the Division upon their completion <br />I certify that the Mayflower Acid Dosing Plam Upgrades were completed according to the construction <br />drawings with the two minor changes noted above. Climax is planning to cease operation of the temporary <br />system and initiate operations with the Mayflower Acid Dosing Plam Upgrades by the end of February, <br />2005. As such, Climax is requesting expediting acceptance of this certification by the Division. <br />Sincerely, ' <br />~~ <br />Tavis D. Rogers, P.E. <br />Project Manager, Climax Mine <br />CC: Bryce Romig, Environmental Manager, Climax Mine <br />Ron Valentine„Chief Engineei, Climax Mine. <br />Jay, Cupp, Site Manger, Climax Mine - , <br />.. ,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.