Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 05/16/2007 <br />User: KAP <br />State :Colorado <br />County :Archuleta <br />Site :Weber Pit No 2 <br />Permit/job # : M-1995.056 <br />Abbreviation :none <br />Filename : MO56-005 <br />Agency or organization name :Colorado Division O(Reclamation Mining And Safety <br />Permit or other jab action :Amendment <br />Task descdpcon instal/ Rip Rap in Drainage Ditches _ _ <br />HOURLY EQUIPMENT COST Basic machine'CAT 950G (2002) Horsepower: 180 <br />Attachment no. 1 : ROPS Cab Shift basis : 7 per day <br /> Data source : (CRG) <br /> Utilization °!o <br />Cost Breakdown : Ownership cosUhour : $27.50 NA <br />Opera[Ing costlhour: $29.27 700 <br />Operator cost/hour: $32.78 NA <br />Total unit cosUhoun 583.49 Totalfleet wst/houn $83.49 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 224 LCY Factor: NA vdume'. 224 <br />Source of quantity takeoff :Reclamation Plan <br />Source of estimated swell factor : NA <br />LCY <br />HOURLY PRODUCTION (Cif HB) <br />Loader Cvcle Tlme Unadjusted bask cyGetime (load, dump, maneuver): 0.550 minutes <br /> Factor (min.) Source <br />Cyc4e Time Factors 030 <br />0 (Cat HB) <br />Material:Material 6"and over diameter , <br />Stockpile : umped by truck 0.020 (Cal HB) <br />Truck ownership: NO adjustment-/actor not applicable 0.000 (Cat HB) <br />Ope2tion : Constant operation -0.040 (Cif HB) <br />Dumptarget: NOminal target 0.000 (Cat HB) <br />IVBI Cy4rC U~1lG UUtuau ucr - - - -- <br />Adjusted basic cycle time : 0.560 minutes <br />R II'nq Res'sta c -Road Cond'lions <br />Haul : Soff, rutted dirt, no maintenance or water, 4" Lire penetration <br />Return :Soft, rutted dirt, no maintenance or wateL 4"fire penetration <br />Ha I and Return Time <br /> <br />Haul route : <br />Return mule : Length <br />(feet) <br />300 <br />300 Grade res. <br />(%) <br />10.017 <br />-10.00 Rolling res <br />(%) <br />8.00 <br />8.00 . Total res. <br />(°!o) <br />78.00 <br />-2.00 Travel lime I <br />(minutes) <br />0.6782 <br />02543 Data <br />Source <br />(Cat HB) <br />(Cat HB) <br /> Total travel time : 0.9325 minutes <br /> Total cycle time : 1.493 minutes <br />Loade Bucket CaoacRV <br />Rated capacity: 3.75 LCY (heaped) (Cat HB) <br />Bucket fill factor' . 0.825 Blasted rock- avg. blasted (75-90%) <br />Adjusted capacity : 3.09 LCY <br /> Source <br /> Altitude adjustment factor : 100 (Cat HB) <br />Job Condition Correction Factors 0 <br />83 (7 shiN/day) <br />Site altitude : 7,560 feet J ob effciency factor . <br />: <br /> Net correction . 0.83 multiplier <br />Unadjusted hourly un it production : 124.37 LCY/Hr <br />Adjusted hourly un it production : 70323 LCV/Hr (Cat NB) <br />Adjusted hourly fleet production : 103.23 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 7 Loader(s) Total job time : 2.17 Hours <br />Unit cost : SO.B09 /LCY Total job cost : $181 <br />