Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 05/16/2007 <br />User: KAP <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br /> Operating cosVhour : $73.75 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $164.77 Total fl eet costlhour : $164.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,611 LCY factor : NA volume : 11,611 LCY <br /> <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source ~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dazing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.43 (Cat HB) <br />Average push gradient : 20.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,560 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.56 <br />Weight description <br />Decomposed rock- 50% Rock, 50% Earth <br />Adjusted unit production : 788.35 LCY/hr <br />Adjusted fleet production : 788.35 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 14.73 Hours <br />Unit cost : $0.209 /LCY Total job cost : $2,427 <br />State :Colorado <br />County :Archuleta <br />Site :Weber Pit No. 2 <br />Permit/job# : M-1995-056 <br />Abbreviation :none <br />Filename : M056-001 <br />