My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-25_REVISION - M1995056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995056
>
2007-05-25_REVISION - M1995056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:08 PM
Creation date
11/21/2007 9:47:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Revision
Doc Date
5/25/2007
Doc Name
Amenment Approval
From
DRMS
To
Weber Sand & Gravel, Inc.
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT ~ sheet 2 of 2 <br />Machine Total Fleet Size ` Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) CosUhr/fleet CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $46.34 1 $46.34 ~ $46.34 <br />-Light Duty Pickup, 4x4, 3/4 T. $30.69 1 $30.69 $30.69 <br /> <br /> <br /> <br />Subtotals : $77.04 $77.04 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Pagosa Springs <br />Transportation Cvcle Time : Non- Total one-way travel distance : 3.0 miles <br />Roadable Roadable Average travel speed : 30.0 mph <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />0.10 0.10 Total non-roadable mob/demob cost <br />0.10 0.10 'two round Mps with haul rig <br />0.50 NA Total roadable mob/demob cost ** <br />0.50 NA "' one round trip, no haul rig <br />1.20 0.20 <br />Total job time <br />Total iob cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.