Laserfiche WebLink
Addendum 1 to Glacier Peak and Crystaljack Plan of Operations <br />!Y. DF.SCRIPTIONOFTSEOPF.RAT7ON <br />A. Access. Show on a map (USGS quadrangle map or a National Forest map, for example) the <br />claim boundaries, if applicable, and all access needs such as roads and trails, on and off the <br />claim. Specify which Forest Service roads will be used, where maintenance or reconstruction is <br />proposed, and where new construction is necessary. Fot new constructioq include construction <br />specifications such as widths, grades, etc., location and size of culverts, describe maintenance <br />plans, and the type and size of vehicles and equipment that will use the access routes. <br />`walked" in_ when needed. to the mining_or prospect sites. <br />ADDENDUM A new road access apd construction is being proposed for the following claims onik <br />Free Hawk CBtl No 1 • C&J No 2 Cut Dog, and the nordtem portion of Oui Buc No 7 At this <br />Road width would be a maximum of 12 feet to allow pa~.sage of track-equipped equipment All <br />t~acles would be less than 30% Waterbars would be placed approximate1~75 feet apart on any hill <br />none are expected to exceed one half of an acre at any riven site After approval and con_crn coon. the <br />ro road t. ', ltd 753 <br />necessary the creek bottom would be sraveled Road maintenance would be minimal Esseartiallyt_ <br />after construction. the road would be opened for use by the carne equipment needed for the mininv <br />wourd be Irmrted to three 4-WD vehicles and the track hce used during active mining <br />