Laserfiche WebLink
3. Describe the measures to betaken for release of a reportable quantity of a hazardous material or <br />the release of a toxic substance. This includes plans for spill preve~ion, conainment, <br />notification, and cleanup. <br />There will be no release of toxic materials due to this operation. <br />Additionally the mined substances do nat produce anv toxic substances. <br />JShould we have an accidental sill of diesel fuel we will follow the spill repor[ine rule as outlined <br />degradingbacteria <br />H. Reclamation. Describe the annual and final reclamation standards based on the arrticipated <br />schedule for construction, operations, and project closure. Include such items as the removal of <br />structures and facilities including bridges and culverts, a revegetation plan, permanent <br />containment of mine tailings, waste, or sludges which pose a threat of a release irrto the <br />environment, closing ponds and eliminating standing water, a final surface shaping plan, and <br />post operations monitoring and mairrtenance plans. <br />Each excavation will be closed and reclaimed as soon as possible after mining. Generally an <br />dug pits. trenches. and excavations within the immediate azea of operations will also be reclaimed. <br />will consist of refillingthe excavation with stored waste rock and regradine the site. Stored topsoil <br />