Laserfiche WebLink
<br />3. Describe the measures to be taken for release of a reportable quantity of a hazardous material or <br />the release of a toxic substance. 'Phis includes plans for spill prevention, containment, <br />notification, and cleanup. - _ .. - <br />weather roducts. <br />H. Reclamation. Describe the annual and final reclamation standards based on the amicipated <br />schedule for construction, operations, and project closure. Include such items as the removal of <br />strucwres and facilities including bridges and culverts, a revegetation plan, permanent <br />containment of mine tailings, waste, or sludges which pose a threat of a release into the <br />environment, closing Ponds and eliminating standing water, a final surface shaping Plan, and <br />Post operations monitoring and maintenance plans-- -- ----_..,_ _p... ~.;,.:..., <br />VI. FOREST SERVICE EVALUATION OFPLriN OF OPERATIONS <br />A. Required changes/modifications~special mitigation for plan of operations: <br />r G Nt c ~ r-.<F :~ <br />(If more space is needed to fill out a block ojinformation, use additional sheets and attach to jorm.) <br />returned to a prod ~~ive status <br />