Laserfiche WebLink
,~ <br />C. Project Description. Describe all aspects of the operation including mining, milling, and <br />exploration methods, materials, equipment, workforce, construction and operation schedule, <br />power requirements, how clearing will be accomplished, topsoil stockpile, waste rock <br />placement, tailings disposal, proposed number of dril(holes and depth, depth of proposed suction <br />dredging, and how gravels will be replaced, etc. Calculate production rates of ote. Include <br />justification and calculations for settling pond capacities, and the size of runoff diversion <br />channels. <br />This operation is covered by a $900 Forest Service bond. a Colorado State Mining bond of $ 4.905 <br />_ end a Colorado State orospPec[inp, bond for $ 2.000. <br />(Ijmore space is needed to fiU out a block ojinjormation, use additional sheets and attach to form. ) <br />should be available for review rega~g all ,aspects of this o~erarion. as well as State requirements. <br />