My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-03-17_REVISION - M2003030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003030
>
2006-03-17_REVISION - M2003030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:07 PM
Creation date
11/21/2007 9:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003030
IBM Index Class Name
Revision
Doc Date
3/17/2006
Doc Name
110(s) application
From
Joseph L. Dorris
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We will also plant approximately 30 shrubs per acre to help more quickly reestablish <br />wildlife habitat. We will plant equal numbers of wax currant, Ribes cereum, and meadow <br />rose, Rosa tomentosa. <br />6 3 4 (1-) (d) Post miningponds streams and buildings: <br />No water features or any structures will be affected. No ponds or any water features will <br />be constructed or used. <br />No other features will be created which will potentially affect the hydrological balance <br />or off-site azeas. Reclamation efforts will result in contoured slopes to trap rain and <br />runoff. We will also use some rock water-bazs in the natural draws to prevent any major <br />gullying which might occur after heavy rain. Presently, timber from the Hayman fire is <br />being laid down across slope and across these depressions to reduce possible erosion. <br />Silt fences will be established for slopes greater than 20 percent. These will be removed <br />after 50 percent revegetation has occurred. <br />6 3 4 (1(e) Reclamation treatment of waste rock: <br />No waste rock or dumps will remain on the sites after mining. The waste rocks are <br />silicates and will need no treatment to prevent leaching or toxic materials as none are <br />produced. All materials will be used to backfill the original excavations. <br />6 3.4 (, Actual reclamation cost estimates: <br />Cost estimate is based on maximum excavations and disturbances for any one season <br />(worst case scenario). Estimates are based on actual past costs for reclamation. <br />Reclaiming one excavation of 9,600 ftZ, 120 feet by 80 feet by 20 feet deep, and two open <br />prospects about 1,600 ft2 each, no more than 8 feet deep. Waste rock is stored within 20 <br />feet of excavation. Topsoil is stored within 20 feet of the excavation. No roads are <br />created which need reclaimed. Other disturbed areas such as machine footprint, waste <br />rock and soil storage sites need only be gaded and seeded. <br />Equipment rental (Cat E110B) (per week) <br />Equipment haulage from Buena Vista <br />Diesel, tube, and maintenance at cost <br />Roading in equipment to site <br />Backfill, contouring, and grading <br />Topsoil application and raking <br />Seeding and hand raking <br />Planting trees <br />Cost of seeds <br />Cost of trees <br />4 hours @ $ 20.00 <br />8 hours @ $20.00 <br />4 hours @ $ 20.00 <br />9 hours @ 25.00 <br />8 hours @ 25.00 <br />201bs @ $ 8.00 <br />bundle 24 @ $ 35.00 <br />Total actual cost <br />$ 1,200.00 <br />$ 300.00 <br />$ 80.00 <br />$ 80.00 <br />$ 160.00 <br />$ 80.00 <br />$ 225.00 <br />$ 200.00 <br />$ 160.00 <br />$ 35.00 <br />$ 2,520.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.