Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1981-207 <br />INSPECTION DATE 4-30-2003 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (RV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSlPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 • Material hac h en import d to th cit for uc ac nermanPnt structural fill v~thout req sir d no i . <br />~eJII9~stbmitted to DMG. 06 J 1 B / 2003 <br />PB or PV: PB <br />CORRECTIVE ACTION: <br />Submit adequate notice of importation of material as required by Rule 31 5 !9) We have imported TOPIC(S): AR <br />approxirtfltely 105,1X10 cubic yards of clean fill rteterial which was placed in 2 foot lifts <br />- <br />with a 9886 Wheel Loader. We would like to continue to bring fill into pi~ <br />attached TR-003. <br />2. Hazardous mafPdals are ctorea nn cite without ^deq r^te cnill _ of^inm nt ^nd nn ~nnermitte~d} <br />~ntainment stnrchirP hac_ been installed. <br />06 / 18 / 2003 <br /> <br />CORRECTIVE ACTION: <br />_Either remove all hazardous materials and unpermitted spill containment structures from the site or PB or PV: PB <br />TOPIC(S): AT <br />_ _ _ <br />sJbmit a technical revision application addressing incorporation of adequate spill containmentforall <br />hazardous materials stored on site Include size and construction specifications and <br />demolition/disposal details with reclamation cost calculations See attached TR-004. <br />3. Additional diesel tank at crusher has been brought into crnQliance. <br /> / / <br /> <br />CORRECTIVE ACTION: <br />Bank run dirt was placed tinder trailer and also a 2 1/2 foot berm was built corrpletely PB or PV: <br />TOPIC(S): _ <br />around trailer holding the diesel tank. Also posted at both locations are instruction _ <br />sheets for our operations in case of a spill. See attachment and p tos. <br />I, Steve Shuey, hereby certify that on May 21, 2003, I deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, <br />and to those others within the body of this report who have been designated to receive copies (DMG personnel <br />excepted). <br />/.!/ ~ <br />Signature <br />