Laserfiche WebLink
-4- <br />12. Prunerv future (Post-mininel land use (check onel: <br />_ Cropland(CR) ~ Pastureland(PL) <br />Rangeland(RL) _ Forestry(FR) <br />Residentisl(RS) _ Recreation(RC) <br />R Developed WaterResotuces(WR) <br />_ General Agriculture(GA) <br />_ WildlifeHabitat(WL) <br />_ IrrdustriaUCommercia!(IC) <br />_ Solid WasteDisposal(WD) <br />13. Primary nreaent land use (check one): <br />_ Cropland(CR) _ Pasttueland(PL) % Crenerel Agriculiure(GA) <br />Rangeland(RI,) _ Fonsny(FR} Wildlife Hebitat(WL) <br />_ Residential(RS) ~ Recreation(RC) _ IndustriaUCommercial(IC) <br />Developed Water Resotuces(WR) <br />14. Method ofMinina: Briefly explain mining method (e.g. tntck/shovel): <br />15. On Site Proressine: _ Crushing/Screening <br />13.1 Briefly explain muting method (e.g. tnrck/shovel): <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />16. DescdotbnofAmendmentorConvereion: <br />If you are emending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Re-shaping of existine pond and ron rt r' n f r ff t 8 Wail <br />NO mining will occur. Ponds are being lined and re-shaped and will be an <br />amenity to a future subdivision, providing recreation and water storage for <br />landscape irrigation. <br />