My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-03-17_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-03-17_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:06 PM
Creation date
11/21/2007 9:41:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
3/17/2006
Doc Name
112 Permit Application
From
Siegrist Construction Co.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Supplemental Geotechnical Engineering Report <br />Proposed Slurry Cut-off Walls @ St. vrain Development <br />Weld County, Colorado <br />Terracon Project No. 25045300 <br />Terracon <br />The information obtained by geologic survey and the results of field exploration completed <br />for this current and previous studies indicate that the claystone and sandstone bedrock <br />materials have intact to moderately fractured structure. Generally, the claystone and <br />sandstone bedrock materials are relatively impermeable. However, the sandstone bedrock <br />materials within some areas of the site are very hard and strongly cemented and are highly <br />fractured. These zones were encountered within the western portion of the site and will <br />require particular attention during the design and construction phases. In addition, shallow <br />groundwater conditions along with the presence of gravel and cobble sized materials will <br />require particular attention in the design and construction. It is our opinion that the site is <br />suitable for the proposed construction, provided that the care is taken in the design and <br />construction phases of the project. <br />Other design and construction recommendations, based upon geotechnical conditions, are <br />presented in the report. <br />We appreciate being of service to you in the geotechnical engineering phase of this project, <br />and are prepared to assist you during the construction phases as well. Please do not <br />hesitate to contact us if you have any questions concerning this report or any of our testing, <br />inspection, design and consulting services. <br />Sincerely, <br />TERRACON <br />~f <br />R~ynfbnd L. Denton 11, E.I. <br />Staff Geotechnical Engineer <br />Michael E. Anderson, , .~. <br />Geotechnical Department Manager <br />Copies to: Addressee (5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.