time of seeding and planting; <br />(e) A plan or schedule indicating how and when reclamation will be implemented. Such plan or <br />schedule shall not be tied to any specific date but shall be tied to implementation or completion of different <br />stages of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br />(i) An estimate of the periods of time which will be required for the various stages or <br />phases of reclamation; <br />and <br />(ii) A description of the size and location of each area to be reclaimed during each phase; <br />(iii) An outline of the sequence in which each stage or phase of reclamation will be carried <br />out. <br />(T'he schedule need not be separate and distinct from the Reclamation Plan, but maybe incorporated therein.) <br />(f) A description of each of the following: <br />(i) Final grading -specify maximum anticipated slope gradient or expected ranges thereof; <br />planting; <br />(ii) Seeding -specify types, mixtures, quantities, and expected time(s) of seeding and <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />(iv) Revegetation -specify types of trees, shrubs, etc., quantities, size and location; and <br />(v) Topsoiling -specify anticipated minimum depth or range of depths for those azeas <br />where topsoil will be replaced. <br />F.XTTTRTT (: -Water TnfnrmsHnn (Role 6.4.7; (1) If the operation is not expected to directly affect surface <br />or groundwater systems, a statement of that expectation shall be submitted. <br />(2) If the operation is expected to directly affect surface or groundwater systems, you shall: <br />(a) Locate on the map (in Exhibit C) tributary water courses, wells, springs, stock water ponds, <br />reservoirs, and ditches on the affected land and on adjacent lands where such structures may be affected by the <br />proposed mining operations; <br />(b) Identify all known aquifers; and <br />(c) Submit a brief statement or plan showing how water from dewatering operations or from runoff <br />from disturbed azeas, piled material and operating surfaces will be managed to protect against pollution of either <br />surface or groundwater (and, where applicable, control pollution in a manner that is consistent with water quality <br />dischazge permits), both during and after the operation. <br />(3) You must provide an estimate of the project water requirements including flow rates and annual volumes <br />for the development, mining and reclamation phases of the project. <br />(4) You must indicate the projected amount from each of the sources of water to supply the project water <br />requirements for the mining operation and reclamation. <br />