Laserfiche WebLink
CONDITIONAL LETTER OF MAP REVISION (CLOMR) <br />FOR <br />• ST. VRAIN LAKES <br />Page 4 <br />VII. DRAINAGE IMPROVEMENTS <br />Drainage improvements to the existing gravel mined lakes will serve as the <br />detention requirements of the St. Vrain Lakes development. The lakes will <br />regulate the release rate from the St. Vrain Lakes development for the 10-year <br />and 100-year event by the use of an outlet structure. This outlet structure will <br />release detained flows at the 5-year onsite historic rate. The outlet structure <br />elevation will be set at 4,819.0 feet and is sized so that 0.7 feet of head will <br />convey the 5-yr historic release rate. The emergency spillway will be set at a <br />crest elevation of 4,819.7 feet. The 100-year offsite flows will be conveyed over <br />the spillway to the St. Vrain River. <br />The portions of the flood from the St. Vrain River, which overtop the berm, will be <br />conveyed through the lakes through proposed inline spillways and back to the <br />St. Vrain River. <br />• VIII. HYDRAULIC ANALYSIS <br />The hydraulic analysis along the St. Vrain River was performed using the U.S. <br />Army Corps of Engineers' Water Surtace Profile computer program, HEC-RAS. <br />Manning's n-values -The typical Manning's n-values used for the hydraulic <br />models was 0.04 for the main river channel and 0.07 for the river overbanks. <br />These n-values are consistent with the ACOE model. In the "Existing Lakes" <br />reach, the n-values were adjusted according to the proposed condition. <br />Documentation to support this determination of the Manning's n-value is provided <br />in Appendix A. More about this is discussed in the Post-Project Conditions <br />Model. <br />Pre-Proiect Conditions Model -The original floodplain model data of the lower <br />St. Vrain River has been obtained from the ACOE. This model was titled <br />Vrain1.dat. This model was in the HEC-2 format prior to the bridge routines <br />changing from the Omaha District Bridge Routine to the Special Bridge or <br />Normal Bridge routine. The model was therefore updated and converted into <br />HEC-RAS format. <br />This model was run with a downstream boundary condition of a normal depth <br />with a friction slope of 0.0025 ft/ft. This is the approximate slope of the channel <br />• in this location as determined from the USGS Quad map. The model stretches <br />from the downstream edge of the I-25 Bridge to the fully effective portion of the <br />river downstream of the effects from the WCR13 bridge. <br />