Laserfiche WebLink
• TABLE OF CONTENTS <br />I. INTRODUCTION ........................................................... .......................................1 <br />II. BACKGROUND INFORMATION ................................... ......................................1 <br />III. SITE INFORMATION ...................................................... ......................................2 <br />IV. FLOODPLAIN INFORMATION ....................................... ......................................3 <br />V. DRAINAGE DESIGN CRITERIA ..................................... ......................................3 <br />VI. BASIN HYDROLOGY ..................................................... ......................................3 <br />VII. DRAINAGE IMPROVEMENTS ....................................... ......................................4 <br />VIII. HYDRAULIC ANALYSIS ................................................. ......................................4 <br />IX. DISCUSSION OF RESULTS .......................................... ....................................12 <br />X. MAINTENANCE .............................................................. ....................................12 <br />XI. OWNERSHIP .................................................................. ....................................12 <br />XII. CONCLUSIONS .............................................................. ....................................12 <br />XIII. REFERENCES ...................................................................................................13 <br />XIV. VICINITY MAP AND REFERENCE MATERIALS <br />• XV. LETTERS AND CORRESPONDENCE FROM <br />AFFECTED AGENCIES <br />XVI. CONDITIONAL LETTER OF MAP REVISION (CLOMR) <br />APPLICATION FORMS <br />APPENDICES <br />APPENDIX A -Hydraulic Analysis <br />Pre-Project Conditions Model <br />(NAND 88 Datum) with CHECK-RAS output <br />APPENDIX B -Hydraulic Analysis <br />Post-Project Conditions Model <br />(NAND 88 Datum) with CHECK-RAS output <br />APPENDIX C - Floodway Analysis <br />100-year Pre-Project model <br />(NAND 88 Datum) with CHECK-RAS output <br />APPENDIX D -Maps <br />Existing Firm Maps with Proposed 100-Year Floodplain <br />.• CLOMR Work Maps <br />