Laserfiche WebLink
_~.. <br />(h) specify how much water will be used in conjunction with the operation, and the source <br />of this water; <br />(i) if groundwater will be encountered and/or surface water intercepted or disturbed, <br />describe how mining will affect the quantity and quality of the surface or groundwater and the methods <br />to be used to minimize disturbance to the surface and groundwater systems including proposed <br />dewatering, sedimentcontainment or chemical treatment systems, storm water run-off controls, and <br />groundwater points of compliance; <br />(j) specify how you will comply with applicable Colorado water laws and regulations <br />governing injury to existing water rights; <br />(k) if refuse and acid or toxic producing materials aze exposed during mining, describe <br />how they shall be handled and disposed of in a manner that will control unsightliness and protect the <br />drainage system from pollution; <br />(1) describe what measures will be taken to minimi~r disturbance to the hydrologic <br />balance, prevent off-site damage, and provide for a stable configuration of the reclaimed area consistent <br />with the proposed future land use; and <br />(m) specify whether the deposit will be processed on-site. If the deposit will be processed, <br />then describe the nature of the process, facilities and chemicals utilized. The process azea and any <br />structures must be described on Exhibit E -Map. <br />(n) identify the primary and secondary commodities to be mined/extracted and describe the <br />intended use; and <br />(o) name and describe the intended use of all expected incidental products to be <br />mined/extracted by the proposed operation. <br />F.XATRiT P - Reclamation Plan !Role 63_dle (1) The purpose of the Reclamation Plan is to <br />describe the timing, procedures, criteria and materials that will be used to reclaim the affected land to <br />the proposed future land use. This plan must be correlated to Exhibit E -Map. The description of the <br />Reclamation Plan must be adequate to satisfy the requirements of Section 3.1 and demonstrate <br />compliance with Rule 3. At a minimum, the Application shall include the following inforrnation: <br />(a) specify at what point in the mining plan and to what depth(s) overburden will be <br />replaced in relation to ongoing extraction. <br />(b) specify the maximum gradient of reclaimed slopes (horizontal:vertical). If the <br />Application proposes slopes steeper than 3:1, you must include a justification that supports steeper <br />slopes for the proposed post-mining land use, and demonstrates compliance with the applicable <br />performance standazds of Section 3.1. <br />(c) specify the measures that will be taken to revegetate the site, if applicable, including: <br />(i) The thickness of plant growth medium to be replaced. Sample and analyze <br />available soils sufficiently to establish quantity and quality; <br />