Laserfiche WebLink
JRN-09-2003 10.32 <br />January 4, 2002 <br />Lafarge Metro Land <br />bivision Of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Rm 215 <br />Denver, CO 80203 <br />F'a,~-'~3 g~~- P1~6 <br />q~ ~n <br />Fr, r~ <br />303 657 4037 <br />'-~p~(v~ 54h~c/wef <br />~9+~4-, <br /> <br />Re. East Rigden Pit, M-1979-097, Technical Revision- Request for Extension <br />Cl9ss: f~evisiJn /Y~e-S~. T-a. <br />Deaz Mr. Schreiner <br />In November 2002, Lafarge submitted a Technical Revision letter and slope stability design and <br />plans for the East Rigden Pit. On November 19, 2002, Lafarge received 5 adequacy review <br />comments pertaining to the slope stability design and deadlines for the revisions. A response <br />was requested for on or before becember 4 2002. Lafarge would like to wave its rights for the <br />30-day decision date and extend the deadline for the response 30 additional days to January 4, <br />2002. <br />If you have any questions or concerns please to not hesitate to call. <br />P. <br />Eric ReckenHne <br />Land Manager <br />(303) 657 4330 <br />TOTRL P.01 <br />