Laserfiche WebLink
3. Remaining roads = 24.4 acres. <br />In addition, areas within the revised permit area that will be disturbed by <br />construction of the irrigation pond and pipeline will require revegetation. <br />These areas include: <br />4. Pipeline corridor = 9.7 acres. <br />5. Pond area (outslopes and 50 feet beyond perimeter, but not <br />interior) = 11.4 acres <br />6. Borrow azea and associated roads = 7.5 acres <br />The resulting total azea requiring seeding = 80.6 acres. <br />Item Total: (80.6.0 acres)($156) _ $12,574 <br />L.6 Reclamation Summary <br />Total reclamation construction contract amount: $520,135 <br />Contractor's overhead and profit: (12%)($520,135) _ $62,416 <br />Total construction contract amount: $582,551 <br />Water Samples: $15,708 <br />Monitoring well abandonment amount: $22,000 <br />Minerals Program Administration Fee: (5%)($582,551+$15,708 +$22,000) _ $31,013 <br />Total Performance Bond Amount for Remaining Reclamation Obligation: $651,272 <br />L.7 References <br />Steffen Robertson and Kirsten (U.SJ 1994. Permit Modification: West Pit Partial <br />Backfill, San Luis Project, Costilla County, Colorado, DRMS No. M-88-112. <br />Permit Modification Application, May 9, 1994. <br />Battle Mountain Resources, /nc. 41 Telesto Solutions, /nc. <br />P1POjecm\212-Newmovt(Svd.ais)15anLais\Pe~mu Amendmem- West Pi~Managemem\V4 ReponffiPDFSV'ertvitAmendmen~ vb.doc October 2006 <br />