My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-30_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2006-10-30_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:34 PM
Creation date
11/21/2007 9:29:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/30/2006
Doc Name
Application and exhibits
From
Battle Mountain
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.3 Roads <br />Roads to be reclaimed by ripping, regrading, and replacing topsoil. Road areas <br />remaining to be reclaimed (per 2005 reclamation summary) include: <br />1. Road around Tailings Collection Pond = 4 acres. <br />2. Tailing perimeter road = 12.9 acres. <br />3. Pink Gneiss Pit Haul Road = 3.8 acres. <br />4. Waste Rock C Access Road = 3.7 acres. <br />5. Total Road Area remaining = 24.4 acres. <br />Ripping (per L.1.6) _ (24.4 acres)($90/acre) _ $2,196 <br />Regrading (per L.1.2) _ (24.4 acres)($260/acre) _ $6,344 <br />Topsoil Replacement (per L.1.3) _ (24.4 acres)($2880/acre) _ $70,272 <br />Topsoil Grading (per L.1.4) _ (24.4 acres)($260/acre) _ $6,344 <br />Item Total: $85,156 <br />L.4 Miscellaneous Costs <br />Costs included as miscellaneous items in the estimate include mobilization and <br />demobilization of equipment, maintenance of site roads during remaining reclamation <br />work, testing of water samples, and abandonment of monitoring wells and <br />piezometers within the permit azea. <br />L.4.1 Mobilization/Demobilization <br />Mobilization from Monte Vista, CO = $8,500 <br />L.4.2 Road Maintenance <br />Water truck and motor grader required for 8hr/day, 6 days/year (per previous <br />estimates) for the next three yeazs. <br />Batt/e Mountain Resources, /nc. 39 Te/esto Solutions, Inc. <br />I':)I'mjec~s~212-Newmom(SviLUis)~SaN.uisV'elmit AmenOment- Wu~Pit Maiugemem\V6 Report&POrs~PCrmitAmendmen~ v4.doc October 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.