My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-18_REVISION - M1983052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983052
>
2003-12-18_REVISION - M1983052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 11:51:01 AM
Creation date
11/21/2007 9:26:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983052
IBM Index Class Name
REVISION
Doc Date
12/18/2003
Doc Name
Request A Reclamation Acceptance
From
Mike Frick Dirt-N-Iron Inc.
To
DMG
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Completion of reclamation of the Joker Mlne <br />Moffat county, Colorado <br />For Mlning & Minerals II, LTD. <br />By DIrt-N-Iron, inc. <br />Dirt-N-iron, Inc. has completed the reclamation of the joker <br />mine as outlined by the Colorado Division of Minerals & <br />Geology and as directed by Carl Mount of CDMG. <br />The following is a list of concerns about reclamation but is <br />not limited to all the work that was required to complete the <br />reclamation. <br />• Dismantled all buildings and equipment <br />• Hauled off all useable salvage <br />• Buried unwanted wood, paper & iron. No toxic, <br />chemicals or petroleum products were buried onsite. <br />• See attached report of black barrels of what was <br />thought to be acid. <br />• 10 gal. of dry Cyanide found onsite was taken to Mike <br />Frick's personal property for use as hobby gold <br />separation <br />• Lower pond was reclaimed. <br />• Upper pond was kept in place as requested by the BLM. <br />• Constructed spillway in upper~pond <br />• Graded slopes to a 3:1 and/or to blend to existing <br />topography. <br />• Plugged wells acxording to Colorado well plugging <br />standards. Kept other wells as requested by BLM> <br />• Applied top soil to slopes and ripped parallel to contour <br />• Seeded with seed mix in reclamation plan. <br />• Mulched entire disturbed area with certified weed free <br />barley straw. <br />
The URL can be used to link to this page
Your browser does not support the video tag.