Laserfiche WebLink
Following is an estimate o1 reclamation costs. Bear in mind that this estimate is based on today's cost and is <br />subject to inflation and economic fluctuations. Changes and revisions as a result of the review process to the <br />accompanying reclamation plan may also affect the total cost. <br />ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL <br /> PRICE <br />1 Mobilization <45 mi. LS $ 6,000.00 <br />2 Grading and Sloping CY 325,730 $ 2.00 651,460.00 <br />3 Place Top Soil GY 145,495 1.50 219,742.50 <br />4 Seed, Mulch, Tack, R Fertilize AC 115.4 350.00 40 <br />390.00 <br /> Pit Floor , <br />5 Seed, Mulch, Tack, & Fertilize AC 19.2 800.00 15 <br />360.00 <br /> Side Sla es , <br />6 Demo.lDispose Concrete Batch LS .00 15,000.00 <br /> Plant <br /> Subtotal 947,952.50 <br />7 Indirect Costs LS 30,000.00 <br /> Subtotal 977,952.50 <br />8 Project Management LS 70,267.50 <br /> TOTAL $1,048,220.00 <br />