Laserfiche WebLink
°PY <br />l" <br />,} <br />~~ <br />/~~-~ 2.11 /~U~/~~~n <br />Reclamation Costs / <br />~~x. <br />JUL i 3 2005 <br />Llivisiom m; IYfinamis t& Gaology <br />_~ <br />,~~s J ~r'S1 ~~ <br />v ~ <br />EXHIBIT L <br />The following items represent the estimated cost for the Division to reclaim Riverbend Pit, <br />based on a maximum disturbed area of 145 acres as detailed in the Mining Plan Exhibit, <br />page 15. <br /> <br />ITEM <br />COST/UNIT <br />UNIT TOTAL <br />UNITS <br />TOTAL COST <br />irect Cost.• Earthmovin & Reve elation <br />Grass Seed Mix $39.83 Acre 40 $1,593.2 <br />riliin Grass Seed $18.00 Acre 40 $720.00 <br />ertilizer-40#A N&P $29.23 Acre 40 $1,169.20 <br />ertilizerA lication $12.50 Acre 40 $500.00 <br />o Soilin w/ Dozer/Loader $0.75 LCY 64,500 $48,375.00 <br />Diskin or Scarif in $28.50 Acre 40 $1,140.00 <br />eed Control $30.00 Acre 40 $1,200.0 <br />Back Slo in $0.75 LCY 1,500,000 $1,125,000.00 <br />Conveyor Removal $14.10 Lineaz Foot 16,000 $225,600.00 <br />obilization&Demobilizatio $1,500.00 Lum sum 1 $1,500.00 <br />Coin acted Liner Installation $2.25 LCY 325,000 $731,250.00 <br />otal Direct Reclamation Cost $2,138,047.4 <br /> <br />ndirect Cast: Overhead & Pro :t <br />Public Liabilit Insurance 1.55% $33,139.73 <br />Contractor Performance Bond 1.55% $33,139.73 <br />Contractor Profit 10.00% $213,804.74 <br />MG Pro'ect Administration Ex ense 5.00% $106,402.37 <br />otal Indirect Reclamation Cost $386,986.5 <br /> <br />otal Performance Bond Amount $2,525,033.9 <br />Per Acre Cost of Reclamation (145 affected acres) $17,414.03 <br />F[ Lupton PI( <br />OMG 111 Perini( <br />Page 59 oj8l <br />