My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-04_REVISION - M1998013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-02-04_REVISION - M1998013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:03 PM
Creation date
11/21/2007 9:20:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
2/4/2003
Doc Name
Revised Reclamation Cost Estimate and Stability Analysis
From
TETRA TECH
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />FEB 0 4 2003 <br />The Shores Resource -Amendment No. 1 <br />Table for Reclamation Cost Estimate <br />Division of Minerals and Gealagy <br />Activity Quantity Units Unit Costs Cost <br />A. Phase 8 - 95% mined -approximately 60 acres of <br />disturbance. Fill sideslopes of pond with overburden <br />material and shape, seed and mulch shoreline - <br />approximately 72851E perimeter distance at limit of <br />mining - 7035 If at reclamation <br />1 Replace fill material using overburden and shape pond <br />side slopes at 3:] 236,249 CY $ 0.75 $ 177,187.00 <br />2 Replace overburden and shape the shoreline @ 4:1 13,028 CY $ 0.75 $ 9,771.00 <br />3 Replace 12" of topsoil on the shoreline @ 4:1 5,373 CY $ 0.75 $ 4,029.00 <br />4 Seed and mulch shoreline 3.33 Acres $ 800.00 $ 2,664.00 <br />_ ~"'" ~_k`_ w > Subtotal: _$= 193,651.00' <br />B. Dewatering trench would be excavated to nearly the <br />pond bottom elevation and fill with water ----- ----- ----- ----- <br />-. _ ~ < : '°- ` ~. _. == .. Subtotal <br />C. Phase 7 -Would be 100% reclaimed _____ _____ _____ _____ <br />'. `_ :.. ' " = _ ` ~ <br />~ , ` . _ -.,:Subtotal '> -`-r-- ' <br />M <br />D. Processing area. Processing equipment is portable and <br />would be removed by the operator <br />1 Move serge piles into settling pond 1,000 CY $ 0.75 $ 750.00 <br />2 Remove concrete pad for wash plant 15 CY $ 65.00 $ 975.00 <br />3 Remove concrete pad for asphalt plant 60 CY $ 65.00 $ 3,900.00 <br />4 Remove concrete pad for concrete plant 37 CY $ 65.00 $ 2,405.00 <br />5 Demolish and remove shop 1 LS $ 2,000.00 $ 2,000.00 <br />6 Remove concrete footings for office 8 CY $ 65.00 $ 520.00 <br />7 Remove concrete base for scale 10 CY $ 65.00 $ 650.00 <br />8 Scarify ground 25 Acres $ 150.00 $ 3,750.00 <br />9 Spread 12" topsoil 8,067 CY $ 0.75 $ 6,050.00 <br />10 Seed and Mulch 25 Acres $ 800.00 $ 20,000.00 <br />--- <br />_-. <. Subtotal $ 41,000:00 <br />E. Settling Ponds <br />1 Place 12" overburden on 0.25 acre 403 CY $ 0.75 $ 303.00 <br />2 Place 12" topsoil on 0.25 acre 403 CY $ 0.75 $ 303.00 <br />3 Seed and Mulch 0.25 Acres $ 800.00 $ 200.00 <br />Subtotal $ 806.00" <br />F Slurry Wall @ 20% Installation Cost per DMC <br />Bonding Requirment. Assuming a total of 19,932 if of <br />wall, avg depth of 26.5' + 3' into bedrock <br />1 Excavation, Materials and Labor and Dewatering 117,599 Face Ft $ 3.00 $ 352,796.00 <br />Subtotal $ 352,796.00 <br />Total Disturbance Costs $ 588,253.00 <br />Contractor Mobilization (8%) $ 47,060.24 <br />Overhead (18.5%) $ 108,826.8] <br />Administration {5% $ 29,412.65 <br />Total $ 773,552.70 <br />* Assumes 19932 linear feet, average depth 26.5' (+ 3' into bedrock) @ 20% <br />Per Mining Plan Revisions <br />HALL-IRWIN CORPORATION -THE SHORES AMENDMENT 1 (#M-1998-013) <br />Page 22 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.