My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-06_REVISION - M2002114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002114
>
2007-03-06_REVISION - M2002114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:02 PM
Creation date
11/21/2007 9:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
Revision
Doc Date
3/6/2007
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Retum Trip <br />Description CosUhour/unit (No. units) Cost/hr/fleet CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $53.85 1 $53.85 $53.85 <br />Subtotals : $53.85 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Trans ortation C cle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipment <br />Haul time (hours) = 0.09 0.09 <br />Return time (hours) = 0.09 0.09 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.17 0.17 <br />Total non-roadable mob/demob cost' <br />'two round trips with haul rig <br />Total roadable mobldemob cost ** <br />"one rountl tdp, no haul rig <br />$53.85 <br />Fruita <br />3.0 miles <br />35.0 mph <br />$4,116.35 <br />$9.23 <br />JOB TIME AND COST Total job time : 2.34 hours <br />Total job cost : $4,126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.