Laserfiche WebLink
Truck/LoadsrTeamWorkconYd Task#: 001 <br />Loading Tool Cvcle Time : Number of loading foal passes required to fill truck <br />Exnavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.:NA <br />-cycle time elements (min.) : Load <br />NA Maneuver ; NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cyde time (load, maneuver, and dumf 0.475 minutes <br />Cyde Time Factors Loading Condition Descriptlon Factor (min.) Source <br />Material • atedal 6"and over diameter 0.030 (Cat HB) <br />Stockpile: Conveyor or dozer piled fO H. high and up 0.000 (Cat HB) <br />Truck ownership : Common ownership o(trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.050 minutes <br /> Adjusted loader cyde eme (total time per loader pass) : 0.425 minutes <br /> Net load time per Wck ": 1.800 minutes <br />Truck CVCIC Tim@ : • bulk a(1st loader ryde completed during Duck exchange rc adj, loader C/de tlma <exchange tlme <br />Truck exchange time ••: 0.50 mirwtes........ Adjusted for site altitude : 0.500 minutes <br />Truck load time: 1.800 minutes........ Adjusted for site altitude : 1.800 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.800 minutes <br />"set at 0 if exrhange tlme <adl. loatler cyde time (WCk exchange cortpl¢tetl during 1st loader cyde) <br />Truck travel (haul & return) time: Road condition :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul route <br />Road <br />segrrent n Haul distance Grade <br />res. (°~) Rolling <br />res. (°/a) Total <br />resistance (°h) Speed Travel time <br />(minutes) <br />1 400 0.00 5.00 5.00 2218 0.290 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Loading tool unit production : 220.11 LCY/hour...... Adjusted forjob efficiency: 182.69 LCY/hour <br />Truck unit production : 141.72 LCY/hour...... Adjusted forjob efficency : 117.62 LCYlhour <br />OpBmal no. trucks/loading tool : 2 trucks........... Selected no. tacks/loader: 2 trucks <br /> Adjusted houdy truck team production : 235.25 LCYhrr <br /> Adjusted hourly single truck/loader team production : 182.69 LCY/hr <br /> Adjusted houdy multiple WckAoader team production : 182.53 LCY/hr <br />3 k ) <br />. :'.: .. ... Y.n... <br />.... ..u ... .. .. <br /> <br />.. ... .. .5...... ... ..... .. n ..... ..n.t . ~ <br /> <br />.... v.... .... <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Tota4 job time : 82.11 Hours <br />Unit cost : x1.250 /LCY Total job cost : 518,752 <br />5 <br />sheet 2 of 2 <br />'Navel titre shW'm fw WCh segment includes acceleratlaNdecelemPion adjustment Return Bme•`: 0.182 minutes <br />^total haul and return time shwm includes alOWde 8tlj115tment Total Yuck cyGe tlme: 3.572 minutes <br />