continue until the CKD landfill operations have been completed in <br />area E3. Limited reclamation will then be done since A3 is mostly <br />a pre-law area, with the MLRB permit covering only the fourth cut. <br />The reclamation will consist of partially filling with stripped <br />material from C4, and the breaking down of the hiwall 'to a safer <br />configuration. <br />A4 and A5 will receive stripped material from C3 and C4 as part of <br />the quarrying operation in those cuts. Fourth cut overburden piles <br />will be used for additional fill and cover, and the hiwall will be <br />broken back to safer configuration. <br />A6 and A7 have been reserved for use as a water supply reservoir, <br />but that usage no longer appears as necessary as in the past. <br />Reclamation on A7 will start this year, and reclamation on A6 will <br />follow immediately. <br />Current quarrying operations are concentrated in area E1. The <br />stripping was completed in early 1992, and 4 faces are being <br />quarried for production. Some minor additional production is <br />coming from weathered material in E2 and E4, but for <br />simplification this is not shown on the Time Line of Operations. <br />When quarrying is completed in El, and the CKD landfill in A2 is <br />completed, the CKD landfill operation will be moved to E1. It will <br />then be reclaimed with cover from the adjacent overburden piles. <br />The quarrying operations will then move northward into tike other E <br />• areas in sequence with the CKD landfill following, and the <br />reclamation being done by cover from the overburden piles. The <br />quarrying of the E areas will be completed with E5, and the CKD <br />landfill is projected to be completed in E4. North of 1;he middle <br />of E4, reclamation will be limited to the overburden on hand, and <br />the breaking down of any hiwalls. Finished topography will <br />resemble the pre-mining topography in flavor, with rocky west- <br />facing slopes, low cliffs, and native vegitation. <br />The C band areas provide supplimentary material for the raw mix <br />blend rather than the principal components. Its usage is projected <br />to be not more than 20% of the raw mix blend. C1 will bey produced <br />after the covering of the CKD landfill in A2. At that time the <br />overburden material stripped from C1 will be cast to the west onto <br />the top of the A2 area. At the completion of the quarrying of C1, <br />the overburden will be brought back for reclamation, and 1:he hiwall <br />will be broken down. <br />C2 will not be quarried until A3 has completed its dust suppressent <br />water function, at which time the overburden from C1 will be cast <br />to the west and used in the reclamation of A3. Reclamat.ion of C2 <br />will consist of breaking down the hiwall, spreading the stripped <br />topsoil, and seeding with native vegetation. <br /> C3 and C4 will be mined and reclaimed in a similar manner, with the <br />• overburden being used in the reclamation of A4 and A5. <br />