My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-10-28_REVISION - M1980027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980027
>
2002-10-28_REVISION - M1980027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 9:09:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980027
IBM Index Class Name
Revision
Doc Date
10/28/2002
Doc Name
Bond Calculation
From
DMG
To
Bumgarner Ranches
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating SoRware <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 10/28/2002 <br />User : KAP <br />State :Colorado <br />County :Grand <br />Site : eng Pit <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :bond recalculation -inspection <br />Task description :glade tOpSO%l <br />Basic machine :Cat D8R - <br />Bladetype :Universal <br />Attachment no. 1 :BOPS Cat <br />Attachmentno.2:NA <br />Horsepower: 305 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : ~ Ownership cosUhour : $42.44 ~ NA <br /> Operating costlhour : $59.07 100 <br /> .Ripper op.cosVhour : $0.00 NA <br /> Operator cosVhour : $30.65 NA' <br /> Total unit cost/hour : $132.17 Total Fleet cosUhour: 5132.17 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 700 LCY factor : NA volume : 700 LCY <br /> <br />Source of estimated volume :size of site/reclamation plan <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 500 feet Mate rial consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 122.2 LCY/hr Dozing method : 1.00 (gen.) <br /> visibility : 1.00 (avg,) <br />Material consistency description : Job efficiency : 0.83 (lshiff/day) <br />Consolidated stockpile Spoil pile : 0.80 (/nd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/UJ <br />Material weight : 3.300 Ibs/LCY Net correction : 0.35 <br />Weight description <br />8U <br />PermiVjob# : M-1980-027 <br />Abbreviation :none <br />Filename : M027-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.