My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-04-28_REVISION - M1977020
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977020
>
2004-04-28_REVISION - M1977020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:30 PM
Creation date
11/21/2007 9:09:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977020
IBM Index Class Name
Revision
Doc Date
4/28/2004
Doc Name
Adequacy Info
From
Oldcastle SW Group Inc dba United Companies of Mesa County
To
DMG
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COSTS <br />The worst case scenario of pit is the current state of the pit. 2500' of slopes would need to be <br />reclaimed. These slopes would not require additional fill material. Final slopes would be <br />achieved by dozing the crest of the slope down to the toe. The cross-sectional area of the slope is <br />--300 sgft. Therefore, the total slope volume would be 28,000 CYD. The buffer will need to <br />replaced as per the reclamation design. The western lake will need to be partially dewatered in <br />order to perform final slope work and topsoiling. The expected material to be moved for this <br />slope work is 10,000 CYD. Once slope work has been completed 12.5 acres of azea will need to <br />be topsoiled with 6" of material. (10,000CYD) After topsoiling all areas will be disced to remove <br />compaction. 10.06 acres will be revegetated using the dryland mix and 2.44 acres will be seeded <br />with the wetland mix. 1200 tublings will be applied to the shorelines at a material cost of $1.00 <br />and an application cost of $1.00. <br />Reclamation Costs and Timetable <br />Task Description Time Needed Cost <br /># months <br />1 Regrade highwall slopes. 2500' of 0.5 $8,400 <br /> highwall, 300 sgft ofcross-sectional <br /> area, 28,000 CYD to be moved on a <br /> short push with a D8. (28,000@ <br /> $.30/CYD) <br />2 Replace Amendment #1/#2 Buffer. 0.5 $6,400 <br /> Move 16,000 CYD of material to <br /> location. (16,000 CYD @ $.40/CYD) <br />3 Compaction of Buffer. 90% 0.0 $8,000 <br /> Measured Compaction. Concurrent <br /> with Task #2 (16,000 CYD @ $.50 <br /> CYD) <br />4 Partially, de-water western pit. 0.2 $10,000 <br /> $10,000 <br />5 Re-rgrade western pit slopes. (10,000) $3,000 <br /> CYD @ $0.30/CYD) <br />6 Spread 6" of topsoil over all 0.5 $4,000 <br /> remaining azeas. 12.5 acres by 6", <br /> ~IQOOOCYD. ($.40/CYD) <br />7 Disc all topsoiled azeas to 1.3' depth 0.2 $5,000 <br />Pit No. 1 1/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.