Laserfiche WebLink
r III IIIIIIIIIIIII III <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman Room 115 <br /> Denver,Colorado 80203 <br /> Phone:13031 866-3567 <br /> FAX:(303)ri 3?-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> October 7, 1996 <br /> Roy Romer <br /> Me. Julie Goettemoeller Governor <br /> Western Mobile Boulder, Inc. Tames S.Lochhead <br /> 1590 W. 12th Avenue [+ecmve Duecto, <br /> Denver, CO 80204 Michael B Long <br /> Divivon Dueclor <br /> Re: Nelson Pit, Permit No. M-74-070, Succession Approval, Revision No. SO-002 <br /> Dear Ms. Goettemoeller: <br /> On October 7, 1996, the Division of Minerals and Geology approved the succession of <br /> operators from Western Mobile, Inc to Western Mobile Boulder, Inc. for this <br /> operation. Western Mobile Boulder, Inc. is now the permitted operator of the Nelson <br /> Pit, and as such, is responsible for all provisions in Permit No. M-74-070, as well <br /> as those specified in the Rules and Regulations. Western Mobile, Inc is relieved <br /> of all responsibilities concerning this operation. <br /> Please Note: <br /> 1. All of the application materials, as amended and supplemented, are an integral <br /> part of your permit. They have been incorporated into the permit by reference. We <br /> presume that you have a copy of all of these materials; therefore, none have been <br /> enclosed with this mailing. We suggest that you keep a copy of the permit and the <br /> permit application at the mining operation as a reference for operating personnel, <br /> to help ensure compliance with the terms of the permit. <br /> 2. Changes in the mining and reclamation operations that differ from those <br /> described in the permit may require a modification to the permit. We suggest <br /> consulting the Rules and Regulations and/or contacting us to determine if a <br /> modification to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 <br /> to Technical Revisions, and Rule 1.11 to Conversions. <br /> 3. On your permit anniversary date each year, you must submit an annual fee and <br /> annual report to us. Please consult the Rules, Act, and your permit for specific <br /> requirements. <br /> If you have any questions, contact me. <br /> Sincerely, <br /> Carl B. Mount <br /> Senior Environmental Protection Specialist <br /> CBM/BDC <br />