My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-29_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2003-09-29_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:46:08 PM
Creation date
11/21/2007 9:07:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
9/29/2003
Doc Name
Operation of Water Treatment Plant and Reclamation o f5.67 acres of the Herbert Placer
From
Gold King Mines Corporation
To
DMG
Type & Sequence
AM5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOHN F. ABEL, JR. <br />MINING ENGINEER <br />Mr. Steve Fearn <br />Silver Wing Co. <br />P.O. Box 299 <br />Silverton, CO 81433 <br />a <br />Q`ye 310 <br />URT <br />4QIc <br />~~~ <br />i°. 8pgp1 <br />GOL~N <br />~ <br />fit <br />~ 7 <br />~ <br />FAX 278 <br />8163 <br />! <br />l ~^ <br />C~ ~~~ ~~5~ ' <br />G,~ - <br />JFAbe12000^~A. mt <br />J <br />~ ~, R" <br />~ <br />,N` <br />~\~~ July 19, 2003 <br />Reference: Bulkhead design, Mogul Mine, No. 1 Level <br />Dear Steve: <br />This letter report presents the bulkhead design for the No. 1 <br />Level drainage tunnel for the Mogul Mine. A 9-ft thick bulkhead <br />is recommended for the 8-ft wide, 8-ft high tunnel section between <br />Stations 2+91 and 2+50, indicated on the Figure 1 plan view and <br />Figure 2 cross section. The bulkhead sill elevation is <br />approximately 11,922-ft. The bulkhead requires two-way cage of 60 <br />ksi #6 rebar (3/4-in diameter) on 12-in centers for tensile, <br />shrinkage and temperature reinforcement at the downstream side and <br />the same rebar cage for shrinkage and temperature reinforcement at <br />the upstream side. The bulkhead will include a 6-in schedule 90 <br />stainless steel bypass pipe and gate valve to allow the mine pool <br />to be drawn down if and when required. <br />DESIGN CRITERIA <br />it~e purposes o~ Che bulrineaci is i.o iuipeunci tilt nwxiuiWti ~~• yj~~lii <br />of acidic (range from a pH of 1 to a pH of 5) and sulfate bearing <br />(range from 600 to 900 ppm) water that flows out the No. 1 Portal <br />during an annual cycle. Figures 1 and 2 indicate a direct <br />connection between the tunnel and the ground surface through a <br />crosscut-from the tunnel to the "212-ft Raise to Surface". The <br />maximum static hydraulic head will develop on the bulkhead if <br />water flows out the lowest collar elevation of the "212-ft Raise <br />to Surface", approximate elevation of 11,640-ft. The maximum <br />static hydraulic head is 218-ft above the bulkhead, a hydraulic <br />pressure of 94 psi. The design maximum 0.099 g horizontal <br />earthquake acceleration was calculated from the maximum credible <br />6.5 magnitude earthquake along the Ridgeway Fault, 24 miles 'to the <br />north-northwest. Previous earthquake studies for the Sunnyside <br />Gold Corp. tailings at Gladstone (Sullivan, et al, 1980; Weisser, <br />1982; Knight Piescld Co., 1988) predicted a maximum credible <br />horizontal acceleration of 0.087 g at Gladstone, 25 miles _ <br />r ~~ r, :, <br />~A'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.