My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-29_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2003-09-29_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:46:08 PM
Creation date
11/21/2007 9:07:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
9/29/2003
Doc Name
Operation of Water Treatment Plant and Reclamation o f5.67 acres of the Herbert Placer
From
Gold King Mines Corporation
To
DMG
Type & Sequence
AM5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part I <br />Page No. 8 <br />Permit No.: CO-0027529 <br />E. GENERAL MONITORING, SAMPLING AND REPORTING REQUIItEMENTS <br />4. Records <br />The permittee shall establish and maintain records. Those records shall include the following: <br />(a) The date, type, exact location, and time of sampling or measurements; <br />(b) The individual(s) who performed the sampling or measurements; <br />(c) The date(s) the analyses were performed; <br />(d) The individual(s) who performed the analyses; <br />(e) The analytical techniques or methods used; <br />(f) The results of such analyses; and <br />(g) Any other observations which may result in an impact on the quality or quantity of the discharge as indicated in <br />40 CFR 122.44 (i)(1)(iii). <br />The permittee shall retain for a minimum of three (3) years records of all monitoring information, including all <br />original strip chart recordings for continuous monitoring instrumentation, all calibration and maintenance records, <br />copies of all reports required by this permit and records of all data used to complete the application for this permit. <br />This period of retention shall be extended during the course of any unresolved litigation regarding the discharge of <br />pollutants by [he permit[ee or when requested by the Division or EPA. <br />5. Flow Measurin¢ Device <br />If not already a part of the permitted facility, within ninety (90) days after the effective date of the permit, a flow <br />measuring device shall be installed to give representative values of effluent quantities at the respective discharge <br />points. Unless specifically exempted, or modified in Part I.E.S of this permit, a flow measuring device will be <br />applicable at all designated discharge points. <br />At the request of the Division, the permittee shall show proof of the accuracy of any flow-measuring device used in <br />obtaining data submitted in the monitoring report. The flow-measuring device must indicate values within ten <br />percent of the actual flow being discharged from the facility. <br />h. Sianatx~ :c? Ce*~tificztion Requirements <br />(a) All reports and other information required by the Division, shall be signed and certified for accuracy by the <br />petmittee in accord with the following criteria: <br />(i) In the case of corporations, by a principal executive officer of at least the level of vice-president or his or <br />her duly authorized representative, if such representative is responsible for the overall operation of the <br />facility from which the discharge described in the form originates; <br />(ii) In the case of a partnership, by a general partner; <br />(iii) In the case of a sole proprietorship, by the proprietor; <br />(iv) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking <br />elected official, or other duly authorized employee. <br />(b) All reports required by permits, and other information requested by the Division shall be signed by a person as <br />described above or by a duly authorized representative of that person. A person is a duly authorized <br />representative only if: <br />
The URL can be used to link to this page
Your browser does not support the video tag.