Laserfiche WebLink
^4 ': <br />.~~ da}} <br />facility with our carrier. We expect to have this in place by next week. We had originally <br />planned to append this property to our general policy on our other facilities; however, those <br />negotiations which aze still pending have taken longer than expected. Since 9/11 the whole <br />insurance business has become much more difficult as well as more expensive. We will send <br />you a certificate as soon as this is in place. At this time, the shop facilities aze receiving minimal <br />use. <br />We trust that this letter satisfies your concerns and look forward to a continuing positive <br />relationship with San Juan Corp. <br />spe fully, <br />e~-~ <br />ephen C. P <br />President <br />enc. <br />Design Report by John Abel on Mogul Bulkhead <br />Copy of CDPHE discharge permit for the American Tunnel Water Treatment Plant (Gold <br />King Mines Corporation, operator) <br />2 <br />