Laserfiche WebLink
RECLAMATION COST SU~4A.ARY con['d <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description <br />_______________________________________________ <br />sheet 3 of 9 <br />Cost ($1 <br />Subtotal (H1: <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMO' <br />Task No. Task Description <br />Subtotal (11: <br />J. EAI <br />Task No. <br />12 <br />1J <br />19 <br />15 <br />16 <br />18 <br />Cost ($1 <br />ITHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br /> Task Description ~ Cost ($1 <br />Replace topsoil on drill pads 6 assoc. roads ~ $67, 90a <br />Replace topsoil in Piceance facilities area ~ $10,019 <br />Replace topsoil on Piceance Si[e main access roads $20,094 <br />Replace topsoil on yell field se rvlce road 515,264 <br />Replace topsoil at test mine facility 512,096 <br />Replace soil ® Yellow Cr. Jeep Trail realignment ~ 54,830 <br />Subtotal IJ1: $129,707 <br />