Laserfiche WebLink
Colorado Division of Minerals antl Geolog• <br />_________________________________________ <br />ESTIMATING FORM - BULLDOZER WOR% <br />Task k: 12 Prep. by: ACS Task File Name: M002-12 <br />____________ _________ _____________ <br />Dale: 05/31/99 Pe rmi[ q;M-99-002 Mine: Yankee Gu 1ch Project <br />Permit Ac[ron: New applica[ron <br />Task Description: Replace topsoil ® drill pads b assoc. temp. access rds. <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D6H SERIES II Horsepower: 165 <br />Blade Type: STRAIGHT '""-'-'"" <br />A[[ac hmen[ ql: RO PS Cab Shrft Bas rs: 1/day <br />Attachment p2: N/A ""---""" <br />Cost Breakdown: <br />______________ <br />U[i rzatton <br />k <br />Ownership cos[/hr = 520.36 N/A <br />Opera[ang b overhaul cos[/hr - dozer = 529.0] 100 <br /> -ripper = $0.00 N/A <br />Operator cost/hr = 523.12 N/A <br />Total eqp[. unit case/hr = 5]2.55 Total fleet cos[/ hz ~ 5]2.55 <br />MATERIAL QUANTITIES <br />I m [ral Swell Loose <br />Volume: 80,000.0 ECY <br />____________ Factor: 1.929 Volume: <br />__________ __ 119,285 <br />________ .6 <br />__ LCY <br />_ <br />Source of qua nci[y Cake-oEE: 6" x 98 <br />________ acres, see Cable L-1 in appl ica[ron <br />___________________________________________ <br />Source of es[. swell factor: Swell [a ble - topsoil <br />HOURLY PRODUCTION <br />----------~_____= Job Condition Correcti on Factors <br />Avg. push distance: BO E[. "-----""'------''"' ------'" " <br />"""'--' Operator.......... o. ]B lavg.l <br />Unadjus[etl hourly Mac. consistency.. 1. 00 ICat tbl) <br />dozer produc[ron: 415 LCY/hr Dou ng me [hod..... 1. 00 (gen.l <br />---"'""" Visibility........ 1. 00 (avg.) <br />Material consistency: Job efficiency.... 0. 87 Ilsh/tlayl <br />Consolida [ed stockpile Spoil pile factor. 0. 60 (fnd-sfi <br />""-----"""-----'-""'--' ---""- Push gradient..... 1. 00 (Cat tbl) <br />Avq. push gradient: 0.00 k Ipos) Altitude dera Cion. 1. 00 (Ca[ Gbl) <br />-"'"" " Material weigh[... 0. ]9 (user) <br />Avg. lice altitude: 6500 <br />_________ ft. Blade type........ <br />______________________ 1. <br />________ 00 <br />__ IS or UI <br />Male nal weigh[ 2900.00 16/LCY Ne[ Job Correction 0. 30 <br />Mat. Descr.: _________ _ ________ __ <br />USER-PROVIDED WEIGHT DATA <br />_____________________________ <br />________ Adjusted Uni[ Prod.; <br />_ 123. <br />________ 00 <br />__ LCY/hr <br /> Adjus ted Fleet Production: 123. 00 LCY/hr <br />JOB COST """--- " <br />Flee[ size 1 <br />________ Dozer (sl Total Job Time: <br />_ 929. <br />________ 13 <br />__ Hours <br />Uni[ Cosc 50.590 <br />________ /LCY Total Job Cos[; <br />_ $6"].409. <br />________ 15 <br />__ <br />