Laserfiche WebLink
Colorado Drvrs ron of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WOAK <br />Task q: S Prep. by: ACS Task File Name: M002-B <br />____________ _________ _____________ <br />Date: 05/30/99 Permit q.M-99-002 Mine: Yankee Gulch Proj ec[ <br />Permit Action: New application <br />________________________________________________________ <br />Task Description: Backf ill 6 rough grade Piceance Processing Facility area <br />________________________________________________________ <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DBN <br />Blade Type: UNIVERSAL <br />Attachment ql: ROPS Cab <br />Attachment q2: N/A <br />Horsepower: 2B5 <br />Shift Basis: 1/day <br />Cost Breakdown: <br />______________ <br />Ownership cost/hr = <br />Operating 4 overhaul cost/hr- dozer = <br />-ripper = <br />Operator cost/hr = <br />Total egpt. unit cost/hr <br />Utilization t <br />53'1.39 N/A <br />$55.31 l00 <br />$0.00 N/A <br />$23.12 N/A <br />$115.]6 Total flee[ cost/hr: $115.]6 <br />________ ________ <br />MATERIAL QUANTITIES <br />Ina teal Swe11 Loose <br />Volume: 20,900.0 BCY Factor: 1.250 Volume: 26,125.0 LCY <br />Source of quantity take-off: Application exhibit L - cable L-5 <br />Source of es C. swell factor: Swell table - general fill <br />HOURLY PRODUCTION <br />----------------= Job Condition Correctron Factors <br />Avg. push distance: 220 f[. """"""""_____ ________ ___ <br /> ________ _ Operator.......... O .TS (avg.) <br />Unadjusted hourly Mat. consistency.. 0 .90 (Cat tbl) <br />dozer production: 9BB LCY/hr Dozing method..... 1 .00 (gen 1 <br /> " " """ ' Vis rbrli[y........ 1 .00 (avg.) <br />Ma [e riai consistency : Job efficiency.... 0 .83 (lsh/day) <br />Compacted fill or embankment Spoil pile factor. 0 .80 (f nd-rfl <br />'--'""'° """""" "'------ Push gradnenr..... 0. 83 (Cat Cbl) <br />Avg. push gradiene: e.0o t (poll Altitude dera[ion. 1 .00 (Car rbl) <br /> """'---- - Material weigh[... 1. 00 ICat tbl) <br />Avg, site altitude: 6600 fr. Blade type........ 1. 00 (S or U) <br />Ma[erral weigh[ 2300.00 16/LCY Net Job Correction 0. 3] <br />Mat. Descr.: ________ _ ________ ___ <br />GBNBRAL FILL Adjusted Unir Prod.: 182. 35 LCY/hr <br /> Adjusted Fleet Production: 182. 35 LCY/hr <br />JOB COST " " " " "' <br />Fleet size 1 <br />________ Dozers) Total Job Time: 193. <br />_________ 2'! <br />__ Hours <br />Un1t Cost $0.635 <br />________ /LCY Total Job Cosr: $16,585. <br />________ 99 <br />___ <br />