Laserfiche WebLink
<br />LIST OF FIGURES AND TABLES <br />FIGURES <br />Locations of Exploratory Borings <br />2. Summary Logs of Exploratory Borings <br />3. Gredatbn Test Results <br />4. Direct Shear Test Resuts <br />Table I -Summary of laboratory Test Results <br />5. River Food and Rapid Drawdown Hydrogreph <br />6. Mine Pit Rapid Drawdown Hydrograph <br />7. StabiBty Model <br />RIVER SIDE STABILITY <br />8. Steady State <br />9. Pseudo Static <br />10. Mine Pft Fkxxi <br />11. Rapid Drawdown <br />MINE PIT SIDE STABILITY <br />12. Steady State <br />13. Pseudo Static <br />14. River Flood <br />15. Mine Pit Rapid Drawdown <br />PORE PRESSURE ANALYSIS <br />16. Steady State - Piezometric Surface <br />17. Steady State -Pore Pressures <br />18. River Transient Flow at Peak Flood <br />19. River Transient Pore Pressures at Peak Flood <br />20. River Transient Flow at Rapid Drewdown <br />21. River Transient Pore Pressure at Rapid Drawdown <br />22. Mine PR Transient Flow at Peak Flood <br />23. Mine Pft Transient Pore Pressure at Peak Flood <br />24. Mine Pit Transient Flow at Rapkt Drawdown <br />25. Mine Pit Transient Pore Pressure at Rapid Drawdown <br />ccRs <br />DURHAM PR SLOPE STABILrrY EVALUATION <br />OTL fT PRQIECT N0. FCU77d&1TS <br />sirao.~cTSUem~ao.rcmraerw~~sooo-ounrnvn saossmana.Y.amass.sm e~ar~a.~ ti-ra.+ww.~na <br />WIM1FC0.776773 Tgnsdtlal N 14oc <br />