Laserfiche WebLink
<br /> <br /> I~~ <br />CORE LABORATORIES <br />' Western Atlas <br /> International <br /> .,.>~ ~. <br /> <br />' r i Y l E <br /> ANALYTICAL CHEMISTRY DIVISION QUALITY ASSURANCE MANUAL <br />' SOP N0. REVISION N0. EFFECTIVE O0.TE PAGE <br /> HC-QAC-02 0 1106192 94 of 10~ <br />' <br /> 14.8 Data Review And Approval Documentation <br />' Verification of all primary laboratory functions (from sample receipt and log-in <br /> to final report approval) is documented in each job file. The following items <br /> are reviewed, approved, dated, and initialed by reporting personnel, laboratory <br /> section supervisors, project managers, the QA/QC coordinator, or the <br /> laboratory manager prior to sending the final analytical report to the client. <br /> • Log-In Verification <br />' Data Complete <br /> • Data Verification <br />' QA <br />bl <br />QC A <br /> / <br />ccepta <br />e <br />' Report Approval <br /> Loq-In Verification <br />' <br /> A laboratory section supervisor, project manager, or the laboratory manager <br /> verifies that sample receipt procedures and chain-of-custody completion <br />' instructions were properly followed by the sample receipt/lo~-in technician., <br /> This verification process includes checking that all chain-df-custody and, <br />' parameter request information corresponds to the information entered into <br />LIMS <br /> . <br /> <br />' I <br />Data Comotete <br /> Reporting personnel, group leaders, project managers, or laboratory section <br /> supervisors initial and date the data-complete section of the gocumentation <br />t stamp after al{ assigned analytical parameters have been completed. <br />' Data Verification <br /> Laboratory section supervisors, group leaders, reporting personnel, the QA/QC <br />' coordinator, or the laboratory manager must review and approve the items <br /> specified in section 14.3 prior to initialing and dating the data- verification <br /> area of the documentation stamp. <br />Ll <br />