My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-11-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-11-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 6:22:23 AM
Creation date
11/21/2007 9:02:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/1/1992
Doc Name
QUALITY ASSURANCE QUALITY CONTROL PROTOCOLS FOR THE COLLECTION OF SURFACE & GROUND WATER QUALITY DA
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> I~~ <br />CORE LABORATORIES <br />' Western Atlas <br /> International <br /> .,.>~ ~. <br /> <br />' r i Y l E <br /> ANALYTICAL CHEMISTRY DIVISION QUALITY ASSURANCE MANUAL <br />' SOP N0. REVISION N0. EFFECTIVE O0.TE PAGE <br /> HC-QAC-02 0 1106192 94 of 10~ <br />' <br /> 14.8 Data Review And Approval Documentation <br />' Verification of all primary laboratory functions (from sample receipt and log-in <br /> to final report approval) is documented in each job file. The following items <br /> are reviewed, approved, dated, and initialed by reporting personnel, laboratory <br /> section supervisors, project managers, the QA/QC coordinator, or the <br /> laboratory manager prior to sending the final analytical report to the client. <br /> • Log-In Verification <br />' Data Complete <br /> • Data Verification <br />' QA <br />bl <br />QC A <br /> / <br />ccepta <br />e <br />' Report Approval <br /> Loq-In Verification <br />' <br /> A laboratory section supervisor, project manager, or the laboratory manager <br /> verifies that sample receipt procedures and chain-of-custody completion <br />' instructions were properly followed by the sample receipt/lo~-in technician., <br /> This verification process includes checking that all chain-df-custody and, <br />' parameter request information corresponds to the information entered into <br />LIMS <br /> . <br /> <br />' I <br />Data Comotete <br /> Reporting personnel, group leaders, project managers, or laboratory section <br /> supervisors initial and date the data-complete section of the gocumentation <br />t stamp after al{ assigned analytical parameters have been completed. <br />' Data Verification <br /> Laboratory section supervisors, group leaders, reporting personnel, the QA/QC <br />' coordinator, or the laboratory manager must review and approve the items <br /> specified in section 14.3 prior to initialing and dating the data- verification <br /> area of the documentation stamp. <br />Ll <br />
The URL can be used to link to this page
Your browser does not support the video tag.