My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-11-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-11-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 6:22:23 AM
Creation date
11/21/2007 9:02:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/1/1992
Doc Name
QUALITY ASSURANCE QUALITY CONTROL PROTOCOLS FOR THE COLLECTION OF SURFACE & GROUND WATER QUALITY DA
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~,~~~ CORE LABORATORIES <br />Wesrtern Atlas <br />International <br />' T I T L E <br />ANALYTICAL CHEMISTRY DIVISION QUALITY ASSURANCE MANUAL <br />SOP N0. REVISION N0. EFFECTIVE DATE PAGE <br />Nc.nnc_m n ~rnaro~ ~a nF Tnn <br /> <br /> • Initial calibration verification standards must be analyzed prior to field <br /> sample analyses. <br />' • Continuing calibration verification standards must be analyzed once per <br /> batch or at a frequency of l0% of the sample population, whichever is <br />' greater. <br /> • A method blank and reference standard or stock standard (if available) must <br /> be analyzed with each sample batch. <br /> • Laboratory duplicates must be analyzed once per batch or at a frequency <br />t of 10% of the sample population, whichever is greater. <br /> • Matrix spikes must be analyzed once per batch or at a fr@quency of 10% <br />' of the sample population, whichever is greater. <br /> • Calculate concentrations using linear regression on a sciehtific calculator. <br />' Correlation coefficient, slope, and Y-intercept values must be calculated <br /> and recorded for all standard lines. <br />' I l P <br />t <br /> n s <br />rumenta <br />arameters <br /> Method-specified calibration procedures, frequency requirements, and <br />' acceptance criteria must be followed (see section 12.0). <br />' Manufacturers' equipment guidelines and maintenance schedules must be <br /> followed (see section 12.0). <br /> • The correlation coefficient should be > 0.995 for the majority of <br /> instrumental parameters. <br />' • Initial calibration blanks must be analyzed prior to field sample analyses. <br /> • Continuing calibration blanks must be analyzed once per batch or at a <br />frequency of 10% of the sample population <br />whichever is greater <br /> , <br />. <br /> • Initial calibration verification standards must be analyzed prior to field <br />l <br />i <br />l <br /> ys <br />samp <br />e ana <br />s. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.