Laserfiche WebLink
<br />(4) Off-site wells will continue to be sampled on a semi- <br />annual basis; and <br />(5) All surface water monitoring systems (RS-1 through RS-6) <br />and ground water monitoring stations (D87-24, M-1, M-2, <br />~~ - <br />M-4,~M-6, M-7, M-8, M-9, M-10 and M-11) will continue to <br />be sampled on a quarterly basis. <br />The bi-weekly monitoring station samples will be analyzed for the <br />parameters shown in Table 1, the bi-weekly process system samples <br />will be analyzed for WAD and total cyanide, and five metal species <br />' (copper, zinc, iron, calcium and sodium), the bi-weekly lysimeter <br />samples will be analyzed for the parameters shown in Table 2, the <br />' off-site wells will be sampled and analyzed for the parameters <br />shown in Table 3 and the quarterly monitoring station samples will <br />' be analyzed for the parameters shown in either Table 1 or Table 4, <br />as applicable (January and July samples analyzed foK Table 4 <br />' parameter list and April and October samples analyzed for Table 1 <br />parameter list). <br />' This document presents the quality assurance/quality control <br />(QA/QC) protocols that will be followed in sample handling and <br />' collection, as well as in the analytical process, to obtain <br />representative results at each of the sampling points. <br />Section 2 of this manual presents the protocols for ground water <br />sample collection and handling, Section 3 presents the protocols <br />for surface water sample collection and handling, Section 4 <br />presents the protocols for porous cup lysimeter sample collection <br />and handling, Section 5 presents the protocols for analysis of <br />surface water and ground water samples and Section 6 presents the <br />protocol for analysis of porous cup lysimeter samples and process <br />samples. <br /> -3- <br /> <br />