Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 <br />Denver, Colorado 80203 DIVISION O F <br />Phone: (303) 866-3567 1V1 1 1~1 E RA L $ <br />FAX: (303) 832-8106 & <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFET7 <br />Notice of 110(c) to 112(c) Construction Materials Bill Owens <br />Governor <br />Reclamation Permit Conversion Application Consideration creg E. warner <br />Executive Director <br />Michael 8. Long <br />Division Direttor <br />DATE: Apri125, 2002 <br />TO: Ms. Susan Nachtrieb <br />Colorado Departmern of Health <br />Water Quality Control Division Permit Section <br />4300 Cherry Creek Drive South <br />Denver, CO 80222-1530 <br />FROM: James C. Stevens, Senior Environmental Protection Specialist e7'G~C. ~ ACS <br />RE: Walsenburg Sand & Gravel, Inc., Sand Arroyo, Permit No. M-1978-283 <br />Please be advised that on April 24, 2002, Walsenburg Sand & Gravel, Inc, whose address and telephone number <br />are Hwy. 10, Walsenburg, CO 81089; (719) 738-1883, filed an application to convert M-1978-283, Sand <br />Arroyo, a 110(c) Limited Impact Construction Materials Permit to a 112(c) Regular Construction Materials <br />Permit. The mining and reclamation operation is located at or near Section 27, Township 285, Range 67W, 6th <br />Prime Meridian, in Huerfano County. The application decision is scheduled for July 23, 2002. <br />A copy of the application is available for review at the Huerfano Courny Clerk & Recorder's office and at the <br />office of the Division of Minerals and Geology, Room 215, 1313 Sherman Street, Denver, Colorado 80203. <br />If you desire to make comments or objections, they must be submitted within twenty (20) days of the date of the <br />newspaper public notice to be considered in the application review process by the Division. You should wntact <br />the applicant for the newspaper publication date. If we do not receive your comments or any objection by the end <br />of the public comment period, the Office will assume you have no objection or commerrt to the proposed activity. <br />