Laserfiche WebLink
<br /> ~ <br /> • <br />i <br /> ~ <br />_3_ <br /> I <br />4) The Board, or its authorized representative nay enter upon the <br /> lands of the operator at all reasonable times for the purpose of inspection to <br /> deteroine whether the provisions of the Act have been complied wtth pursuant <br />~ <br /> . <br />to C.R.S. 34-32-121. <br /> 51 This permit may be revoked or suspended for non-compliance with the <br /> Act or applicable rotes or regulations promulgated Dy the Board. <br /> 6) a) Pursuant to 34-32-118(5) of the Aet, the Board has a right of <br /> entry to reclaiu the lands affected by Lhe operaefon. <br /> b) The Board viii enter the lands to perform reclamation only if <br /> the Board has determined: <br /> ' t. that reclamation required by law to have been perfarn~ed <br /> upon such lands has not been perfonaed, and <br /> ti, that finanelal warra~y forfeiture proceedings described <br /> in Lhe Act or similar provisions of subsequent laws, 1f any, have been <br /> Initiated. <br /> 7) The additional conditions set forth in the attached rider, if srry, <br /> are Incorporated herein by reference. <br /> /Jpf/ a) Rider 1s attached. <br /> / / b) No Mder is attached. <br /> MTNED LAND RECLAMATTON BOARD <br /> COLORADO DEPARTMENT OF NATURAL RESOURCES <br /> Director <br /> <br />